Subic has a wide array of choices for transporting within a project site
or from any designated pick-up point to any destination.
A careful study of the route, height limitations, bridge ratings, grades and road conditions are all collectively considered in deciding the best type of trailer / primemover combination. Shown below is a 43T HRSG Side Panel being moved on an 8-line Goldhofer Trailer up an 8% grade. |
![]() the LCT. |
News
Highlights
1. MOFS wins contract to dismantle tower crane at Medical City in Ortigas. 2. American 8460 installed Air Filter Module for Tann Papier at First Philippine Industrial. 3. 90T rescues fallen container at Mariveles Bataan 4. MOF Subic continues to provide
crane services to Asian Terminals inc. at Batangas Port for the Shell Malampaya
Project.
|
||
|
Related Topics Goldhofer
Trailers
|
Our
transport equipments compliment each other. Most project sites in the Philippines
are isolated. Careful planning is a must for the project cargo to reach
the site safely and on time. This requires control over the land and sea
routes.
MOFS Engineering provides the technical support to enable proper planning and execution in the transport of over size cargoes. |
||||
|
|
|
|
|
|
|
|
|
|
|
|
||
| Although careful thought and preparation have been made in the creation of this web page, the author does not take responsibility for whatever losses, delays,and or inconvenience that may be caused by use of information contained herein . It is presumed that the reader has sufficient background in assessing the applicability of the technical information offered in this site or would have access to such qualified advise from a competent Engineer . Some of the information maybe proprietary in nature and as such relevant laws may apply. ['!'] ramrtja. |