CUSTOM CLEARANCE CARGO HANDLING HEAVY LIFT ENGINEERING TRANSPORTATION CRANE RENTAL LCT CHARTERING
MOF Company (Subic), Inc -  Cargo Handling Solutions In The PHILIPPINES
Click to Leave a Message
President:  Mr. Fernando Pena
6TH FLOOR , 2232 CTC BLDG,   ROXAS BLVD.
PASAY CITY,  PHILIPPINES 1300
PHONE:  +63 2 551 3021    FAX:   +63 2 832 2018
E-MAIL:    MOFSUBML@MOF-SUBIC.COM
PROFILE ORGANIZATIONAL CHART
HOME
HISTORY
E. V.  President:  Mr. Lee Baldwin
BLDG 1460 ARGONAUT HWY,  CUBI POINT, SBMA
OLONGAPO CITY, PHILIPPINES 2200
PHONE: +63 47 252 6346      FAX:    +63 47 252 7456
E-MAIL:   INFO@MOF-SUBIC.COM
EXPERIENCE UNITED STATES AFFILIATES
click to Leave a Message
HEAVY LIFT ENGINEERING                                                                                                    CRANE  LIFTS
mofs  engineering
What's Inside
 
  • Crane Lifts
  • Jack & Roll
  • Land Transport
  • LCT Moves
  • Technical Services
  • Feature Article



  • Links
    Contact Us
    Go Back to Main
    Form STD-MOF-RLP-001                                                                                                                            MOF Co. Subic
    Rev. 1                                                                                                                                                                   Engineering

    Rigging and Lifting Plan

    Location : _______________________________________________Date of Lift ___________________
    Load Description : _____________________________________________________________________
    Does this lift Involve Lifting Personnel ?  ______ Yes ____No

    Lift Description 

    A. Weight                                                                                            E.  Sizing of Slings

        1. Weight Empty ( Load or Basket)          ________kgs        1. Sling Selection
        2. Weight of Headache Ball or Block       ________kgs          a. Type of Arrangement _________________
        3. Weight of Lifting Bar                             ________kgs
        4. Weight of Slings & Shackles                ________kgs           b. Number of Slings in Hook-Up __________
        5. Weight of Jib                                           ________kgs           c. Sling Length _______________________
        6. Weight of Headache Ball on Jib           ________kgs           d. Rated Capacity of Slings ______________
        7. Weight of Cable ( Load Fall )                ________ kgs
        8. Allowance for Unaccounted Material  ________ kgs         2. Shackle Selection
          in Equipment ( 10 % of weight)
        9. No. of People Lifted x 115                     _________kgs            a. Capacity ( Tons) _________ 
     10. Others ______________________   _________kgs            b. Shackle attached to load by ___________
                                                                                                                      c. Number of Shackles ________________

    Total Weight                                                   _________ kgs

    Source of Load Weight                                                                       F. Crane

    _________________________________________             1. Type of Crane _____________________
    (Name Plate, Drawings,Calculated)                                             2. Crane Capacity _______________Tons
                                                                                                                 3. Lifting Arrangement
    Weights Verified By:                                                                           a. Max. Distance Center of Load to
                                                                                                                                 center pin of crane ____________m
    _________________________________________                   b. Length of Boom     ____________ m
                                                                                                                           c. Angle of Boom at Pick Up  ______ deg 
                                                                                                                           d. Angle of Boom at set   _________ deg

    B. Jib

         Erected_____  Stored ____                                                                   e. Rated capacity of crane uner most
      1. Is Jib to be used ?  ____________                                                        severe lifting conditions ( From Chart)
      2. Length of Jib         _____________ m                                                          a. Over Rear    __________Tons
      3. Angle of Jib          _____________ deg                                                       b. Over Front  __________Tons
      4. Rated Capacity of Jib  _________ Tons                                                      c. Over Side    __________Tons
          (From Chart)                                                                                      4. From Chart - Rated capacity of the
                                                                                         crane for the lift         __________ Tons
    C. Crane Placement 
      1. Any deviation from smooth solid foundation in the area ?       5.  Maximum Load on Crane ______  Tons

     2. Electrical Hazards in the Area ?  __________________          6. Lift is of Crane's Rated Capacity 
         ___________________________________________
         ___________________________________________    G. Pre-Lift Checklist                      No          Yes
         ___________________________________________
                                                                                                                         1. Matting Acceptable
     3. Obstacles or Obstructions to Lift or Swing ? _________            2. Outriggers Fully Extended
        ____________________________________________          3. Crane in Good Condition
        ____________________________________________          4. Swing Room
        ____________________________________________          5. Head Room Checked
                                                                                                                         6. Max. Counterweight Used
     4. Swing Direction and Degree ( Boom Swing ) _________            7. Tag Lines Used
        ___________________________________________            8. Experienced Operator
       ___________________________________________             9. Experienced Flagman (Designated)
                                                                                                                       10. Experienced Rigger
     H. Cable                                                                                                 11. Load Chart In Crane
                                                                                                                       12. Wind Conditions __________________
     1. Number of Parts of Cable ______________________             13. Crame Inspected By : _______________
     2. Size of Cable ________________________________                  ________________________________
                                                                                                                       14. Functional Test of Crane by : _________
                                                                                                                             ________________________________

    SPECIAL INSTRUCTIONS OR RESTRICTIONS FOR CRANE, RIGGING, LIFT, ETC _________________
    ____________________________________________________________________________________
    ____________________________________________________________________________________
     

                      DIAGRAM                                                                                               DIAGRAM
       CRANE & LOAD PLACEMENT                                                                           RIGGING
     
     

       ________________DATE ______                                               ____________________ DATE_________
     
     

      SIGNATURE OF JOB SUPERVISOR :                                            PLAN CHECKED BY :
     

     _____________________________                                          ___________________________________
     


    Related Topics

    Lift & Rigging Form

    Lift Plans 
    Crane Safety
    Wire Rope Data
    Case Study
     

    Crane Lifts
    Jack & Roll
    Land Transport
    LCT Moves
    Technical Services
    Feature Article
     
    Links
    Contact Us
    Go Back To Main
    Disclaimer
     
    Although careful thought and preparation have been made in the creation of this web page, the author does not take responsibility for whatever losses, delays,and or  inconvenience that may be caused by use of information contained herein . It is presumed that the reader  has sufficient background in assessing the applicability of the technical information offered in this site or would have access to such qualified advise from a competent Engineer . Some of the information maybe proprietary in nature and as such relevant laws may apply. ['!'] ramrtja.